Storage is not a smaller solar project — it is a different underwriting. A battery earns from when energy is used and discharged, so the screening starts with the tariff and the load curve, not the roof.

What makes a storage site

Rate structure first

Demand charges and time-of-use spreads are the revenue engine of behind-the-meter storage. Screening identifies the site's tariff class and whether demand peaks are short and sharp (highly shavable) or long and flat (harder to monetise).

Load shape and solar pairing

Storage paired with solar can shift midday generation into evening peaks and raise on-site consumption. Screening models the pairing qualitatively first — capacity ranges and dispatch intent — before any detailed simulation is commissioned.

Siting and fire-code path

Batteries need a code-compliant home: setbacks, separation, ventilation and fire-protection requirements under the California Fire Code and standards such as NFPA 855, applied by the local fire authority. Screening records the plausible siting options (indoor, outdoor pad, enclosure) and flags the authority having jurisdiction for the developer's design team. Reference: California GO-Biz guidance on battery energy storage permitting, business.ca.gov.

Interconnection configuration

Storage changes the interconnection picture: charging source, export behaviour and non-export configurations are screened against the utility's process — in SCE territory, CPUC Rule 21 — at a preliminary level only. See Rule 21 screening basics.

Standalone or paired

POWWOD screens BESS-only sites (demand management for high-tariff commercial loads such as cold storage and manufacturing) and solar-plus-storage combinations. In both cases the deliverable is the same: a documented screening record with assumptions, gaps and risks stated, matched to developers whose Buy Box includes storage. Tell us your storage criteria.